This Old Fixer Upper, Part 8: The Kitchen!
How to overhaul a kitchen, from floor to ceiling. Or, "how to polish a turd." Everything we did in 6 months: All new plumbing. All new electrical wiring and outlets. All new ceiling lights. All new appliances. New flooring. New cabinets and countertops. New garbage disposal and added a switch to control it. The interior doors where all renovated. Backsplash tile and paint. Removed the ugly AC unit that was in the wall (not the window, the wall) and patched up the drywall. Added a heater duct from the furnace to the kitchen (it used to be heated with baseboard heaters). Knocked down a closet that was taking up space for the kitchen table. Range hood vented through the roof. Custom cubby in the wall for the fridge. New baseboard trim. And more....











